Construction


Quality first

 

 

 

 

The company at present has grown in capital and asset as well as in construction experience. So far our partners are proud of our provision of efficient management and the highest quality of workmanship. The company has accomplished a lot of multidisciplinary projects in joint Ventures with EL General Business Plc. and taking subcontracts from esteemed construction companies like Salini, Yapi Merkezi, Varner, Keangnam Enterprise ltd. Afro-Tsion construction plc, Satcon Construction Plc, ECWC, etc, and working with ERA. Our ultimate goal is to strengthen our capability and to diversify our service keeping our motto, “Quality first”. In the fiscal year 2011, the construction sector was able to execute a total construction turnover of over 571,406,500.00 ETB.

Construction of cheek-dams

Road Construction

Railway Construction

Real state

Asphalt Work

 Construction of paved water way

 

Project Management & Execution Philosophy:

 

Create detail schedule and allocate ample resources to exceed client’s expectation on achieving the target,

Communicate clearly with all project stakeholders,

Track project progress & fine-tune deviations,

Close supervision of the quality of the work, Completion and commission projects ahead of time,

 

Equipment Status:

 

Equipment owned by Beaeka General Business Plc
Items of Equipment Available No.
Dozer 10
Grader 7
Excavator 30 
Loader 
Roller 
Mobile crane 
Dump truck  120 
Water Truck 
Fuel Truck 
Low bed 
Cargo 
Mid bus 
Light Vehicle  19 
Surveying equip. 
Concrete pump 
Concrete Mixer 
Compactor Hand Compactor 
Formwork 3400m2 
Water pump   5  
Generator 7  
Concrete Vibrator 2  

 

Equipment owned by Podery Trading Plc( Beaeka’s Sister Company)
Excavator 
Wheel Loader 
VRoller 
Dump truck   40 

 

 

General Construction Experience:

 

Major projects completed over the past five years

No

Name of project

Owner

Main Contractor

Type of work

Remark

1

Delbi Coal Mining

Delbi Coal Mining S.C.

50% Joint Venture with EL GENERAL BUSINESS PLC

Coal mining

Joint Venture

2

Jimma-Mizan Road Project Contract 1:Jimma-Bonga Junction

Ethiopian Roads Authority

Keangnam Enterprise ltd.

Road project

Sub-contract work

3

Jimma Air Field

Air ports Enterprise

GEOM. LUIGI VARNERO

IMPRESSA CONSTRUZIONI P.L.CO.

Air field

Sub-contract work

4

Beles Multipurpose project

EPPCO

Salini,Varnero works as a subcontractor

Hydro-power

Sub-contract work

5

Bahir Dar University Expansion Project

Ministry of Education

Afro Tsion

University Building

Material delivery (2,280 Ton of Rebar)

6

Jimma University Expansion Project

Ministry of Education

Afro Tsion

University Building

Material delivery (24,000 m3)

7

Dejen felege birhan and Adura –Akobo& Adura Burbe

Ethiopian Roads Authority

Satcon Construction plc.

Road projects

Sub contract

8

Jinka Air filed

Ethiopian Airports Enterprise

Afro-Tsion Construction

Airport

Sub contract

9

Gambella Stadium

Gambella Regional state

Afro-Tsion Construction

Stadium

Sub contract

10

Bole Ayat 40/60 saving house

Housing Enterprise

BEAEKA General Business plc.

2 Blocks of 2B+G+13  Building

Main contract

11

Dessie-Kutaber-Tenta Junction Road project

Ethiopian Roads Authority

China First Highway Engineering Co.Ltd (CFHEC)

10 km road works

subcontract

12

Koysha Spillway and Right dam Excavation

Ethiopian Electric Power

Salini Impregilo

Earth Works

subcontract

13

Mekelle Industrial park Project

Ethiopian Industrial Park Development Corporation

China Communications Construction Company Ltd. (CCCC)

Earth Works

subcontract

14

Hawassa Road Construction Project

Ethiopian Roads Authority

China Communications Construction Company Ltd. (CCCC)

8 km road works

subcontract

15

Kokeb Marble & Paint Factory

BEAEKA General Business

BEAEKA General Business

Factory Blocks, Office and Stores

Main Contractor

16

Millennium School

BEAEKA General Business

BEAEKA General Business

Building & Site work

Main Contractor

17

Robe-Gasera-Ginir Road Project Contract 2

ERA

Afro Tsion Construction

60 Km Road Project

Sub Contractor

18

Imi-Ginir Road  Project

ERA

CCCC

47 km Road Project

Sub Contractor

19

Megech Dam Fill Work Project

 

ECWC

Dam Project

Sub Contractor

20

Jijiga-Gelelesh-Degehamedo Road project Contract 2

ERA

BEAEKA General Business PLC

109.82 Km Road Project

Main Contractor

21

Construction Works of Addis-Gibe River Road Overlay Project: Lot II- Sebeta (Km 15+000)-Kore (Km 79+000)

ERA

BEAEKA General Business PLC

64KM Road Project

Main contractor

22

Construction works of Gebetta Le Hager Gorgora Project

Gebetta Lehager Project office

BEAEKA General Business PLC

Different types Building Projects

Main contractor

 

Present Work Load/Project at Hand

 

Ongoing Projects

No

Name of project

Owner

Main Contractor

Contract Amount

Type of work

Contract type

Status

1

Bole Ayat 40/60 saving house

Saving House Development Enterprise

BEAEKA General Business plc.

103,118,553.43

 

2 Blocks of 2B+G+13  Building

Main contract

95 %

2.

Megech Dam Fill Work Project

ECWC

ECWC

675,543,826

Dam Project

subcontract

30%

3.

Jijiga-Gelelesh-Degehamedo-Segeg Road Project: Contract 2

 

ERA

 

BEAEKA

 

1,828,264,183

109.82km Road

Main Contract

 

23%

4

Awash-Kombolcha-Hara Gebeya Railway Road Project /Hique site/

 

ERC

 

Yapi Merkezi

 

442,069,290

 

 

18km Rail way Project

 

Sub Contract

 

 

27%

5.

Addis-Gibe River Road Overlay Project: Lot II- Sebeta (Km 15+000)-Kore (Km 79+000)

 

ERA

 

BEAEKA

 

 

1,465,539,629

 

 

64km Road Project

 

 

Main Contractor

 

 

 

New

6.

Gebetta Le Hager Gorgora Project

Gebetta Le Hager Gorgora Project Office

BEAEKA

799,419,554

Different building Project

Main Contractor

16%

 

 

 

Quality Statement

 

 

BEAEKA GENERAL BUSINESS PLC is committed to meeting and exceeding clients’ expectations in all aspects of its ongoing operation, including quality workmanship, on-time delivery, professional service, and management. All employees are charged with and expected to commit to this overall policy. Policies, processes, and procedures have been adopted by BEAEKA GENERAL BUSINESS PLC limited to implement this plan. All employees are expected to conduct themselves appropriately at all times in their ongoing dealings with the public and with the perspective and actual clients of BEAEKA GENERAL BUSINESS PLC. Any activities not by the quality system are to be reported to the General Manager of BEAEKA GENERAL BUSINESS PLC.

 

 

 

Relevant Construction Experience

 

Structure work

  • Surveying work
  • Demolishing of existing structures
  • Clearing and grubbing for structures
  • Cleaning of structures
  • Structural excavation
  • Construction of side drainage activities
  • Excavation for side drainage structures
  • Foundation(Bed) preparation
  • Grouted stonework
  • Cast in-situ concrete work
  • Construction of pipe culvert
  •  Masonry work
  • Bed preparation
  • Bedding of pipes
  • Backfilling of structures
  • Pointing of surfaces
  • Construction of slab culvert
  • Foundation preparation
  • Masonry work
  • Reinforcement bar and formwork fixing
  • Concrete work for the foundation and top slab, and
  • Backfilling of structures
  • Construction of box culvert(Single box, double box, and triple box culverts)
  • Foundation preparation
  • Reinforcement bar and formwork fixing
  • Concrete work and
  • Backfilling of structures
  • Construction of the bridge
  • Access and drainage works
  • Foundation preparation
  • Reinforcement bar and formwork fixing
  • Concrete work and
  • Backfilling of structures
  • Construction of earth retaining structures
  • Masonry retaining wall
  • Foundation preparation
  • Reinforcement bar and formwork fixing for foundation
  • Concrete work for the foundation
  • Masonry work
  • Installation of weep holes and subsurface drainage system
  • Backfilling of structure
  • Concrete retaining wall
  • Foundation preparation
  • Reinforcement bar and formwork fixing
  • Concrete work
  • Installation of weep holes and subsurface drainage system
  • Backfilling of structures
  • Gabion wall
  • Foundation preparation
  • Preparing of gabion boxes with their design arrangement
  • Arranging, placing, and filling of the box with stones
  • Provision of geo-membranes
  • Backfilling of structures
  • Construction of paved waterway
  • Construction of cheek-dams
  • Construction of cascades on the outlet of structures

Earth Work(Main work

  • Surveying work
  • Clearing and grubbing work
  • Road bed preparation
  • Embankment work
  • Excavating and hauling of materials with different class of excavation.
  • Subgrade preparation
  • Selected subgrade work
  • Sub base work

Building Construction

  • Surveying work
  • Site Clearing
  • Concrete work
  • Block work
  • Plastering Work
  • Painting work
  • Steel Structure work
  • Roof work
  • Water Proofing work
  • Aluminum work
  • Wooden door work
  • Floor and wall finishing work
  • Sub Surface drainage work
  • Pre Engineered Steel Structure Work
  • Site work

Asphalt Work

  • Prime Coat
  • Otta Seal Work
  • DBST
  • AC